Simulation Analysis of Ground Settlement of Subway Shield Construction Based on FLAC3D
郭根发 GUO Gen-fa
(上海勘测设计研究院有限公司,上海 200434)
(Shanghai Investigation Design & Research Institute Co.,Ltd.,Shanghai 200434,China)
摘要:本文依据上海市地铁15号线某区间岩土勘察所获得的地层资料,针对地铁盾构施工引起的地表沉降问题,采用FLAC3D建立了地层三维模型并赋予相应的地层参数,对该区间盾构隧道施工引起的地面沉降进行了数值模拟分析,对地铁盾构施工具有一定的指导与参考价值。
Abstract: Based on the stratum data obtained from the geotechnical investigation of a section of Shanghai Metro Line 15, aiming at the surface settlement caused by subway shield construction, this paper establishes a three-dimensional stratum model with FLAC3D and gives corresponding stratum parameters, and makes a numerical simulation analysis on the ground settlement caused by shield tunnel construction in this section, which has certain guidance and reference value for subway shield construction.
关键词:FLCD3D;数值模拟;地铁盾构施工;地面沉降
Key words: FLAC3D;numerical simulation;metro shield construction;land subsidence
中图分类号:U455.43 文献标识码:A 文章编号:1006-4311(2022)18-150-03
DOI:10.3969/j.issn.1006-4311.2022.18.047.
文章出处:郭根发. 基于FLAC3D的地铁盾构施工地表沉降模拟分析[J]. 价值工程,2022,41(18):150-152.
|