Innovative Improvement Ideas of Curtain Grouting Water Stop Pulping Station in Non-coal Mine
侯建生①HOU Jian-sheng;曾旺② ZENG Wang;陈光银②CHEN Guang-yin;刘阳② LIU Yang
(①中南勘察基础工程有限公司,武汉 430081;②中国冶金地质总局中南局,武汉 430081)
(①Central South Exploration & Foundation Engineering Co.,Ltd.,Wuhan 430081,China;②Central South Bureau of China Metallurgical Geology Administration,Wuhan 430081,China)
摘要:加强矿山帷幕注浆止水项目的文明施工管理,提升矿山帷幕注浆止水施工的速度与效率,降低制浆站因劳动强度高造成的伤亡事故和因粉尘飞扬吸入人体造成的职业病,制浆站的建设是关键的一部分,创新安全管理,提升制浆站设备设施的本质安全,是必不可少的工作环节。
Abstract: Strengthening the civilized construction management of the mine curtain grouting and waterproof project, improving the speed and efficiency of the mine curtain grouting and waterproof construction, reducing the casualties caused by high labor intensity of the pulping station and the occupational diseases caused by the inhalation of dust into the human body, the construction of the pulping station is a key part, and it is an essential part of the work to innovate safety management and improve the intrinsic safety of the equipment and facilities of the pulping station.
关键词:帷幕注浆;制浆站建设;本质安全
Key words: curtain grouting;pulping station construction;intrinsic safety
中图分类号:TD8 文献标识码:A 文章编号:1006-4311(2024)28-052-05 doi:10.3969/j.issn.1006-4311.2024.28.016
|